Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.) Filing date Publication date Application filed by MY HAND INDUSTRIAL Co Ltd filed Critical MY HAND INDUSTRIAL Co Ltd Priority to CN2011200371963U priority Critical patent/CN202105966U/en Application granted granted Critical Publication of CN202105966U publication Critical patent/CN202105966U/en Anticipated expiration legal-status Critical Status Expired - Fee Related legal-status Critical Current Links Original Assignee MY HAND INDUSTRIAL Co Ltd Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.) Inventor 林健国 谢青芬 Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.) Expired - Fee Related Application number CN2011200371963U Other languages Chinese ( zh) ![]() Google Patents CN202105966U - Electric rivet-drawing machine Check it and decide for yourself.CN202105966U - Electric rivet-drawing machine However, this infographic, by the UK-based Progress Consult Academy, explains what it means to move from AutoCAD to Revit by comparing both software applications in 8 simple points. While this can be regarded, initially, as time-wasting, is it so in the long run? Are the benefits of using a BIM software application worth the struggle? If you are already a Revit fella you probably know the answer – the concept of Families in Revit and the fact that Revit Families are available online and for free are quite helpful. Although both software applications are presented by the same developer, many practices are very reluctant to perform that transition, as it will require more learning, trial, and error. ![]() It is human nature to stick to the comfort zone, and the comfort zone now is AutoCAD, the same as it had been with manual drafting before. The debate of AutoCAD and Revit has been a rising debate inside many practices, recently. While Revit is building information modeling software that is capable of producing intelligent 3D models that enhance the overall construction process not only the documentation phase. Today’s question has become: “Do we evolve from Drafting to Building Information Modeling?” or simply, “Do we change from AutoCAD to Revit?” What is difference between Revit and AutoCAD?ĪutoCAD is computer-aided design software that is mainly used for 2D drafting and 3D models that are quite inflexible. Even now, although they have spread well enough, you could still find some few practices that do not acknowledge the superior capabilities of these applications and resolve to manual drawing. ![]() However, when first introduced, AutoCAD and its fellow computer-aided design software were not immediately embraced by architecture practices. They accelerated the workflow and reduced all the hassle that accompanied manual drafting. These applications revolutionized the drafting process. Is It Time to Change from AutoCAD to Revit? The practice of architecture started with the traditional manual drafting, but then CAD systems were introduced and computer drafting software applications were developed, the most famous of which is Autodesk’s AutoCAD.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |